Most of the manufacturers I work with do not have a sales problem. They have a measurement problem. Revenue is reported, quotas are set, and the pipeline gets described in words rather than numbers, so nobody on the team can be held to anything. A short list of measures, each with a healthy range, fixes it, and a manufacturer between $5M and $100M can run that list off a single page.

Why most sales reporting tells you nothing

Ask a manufacturer’s leadership team what their sales number is and you usually get one of three answers: last year plus a percentage, bookings as reported by whoever remembered to enter them, or nothing at all. None of the three can be improved, and none of them can be coached to.

A measure earns its place on the page only when it changes what somebody does this week. Win rate changes which deals get worked. Quote turnaround changes who a rep sits with. Customer concentration changes how the owner spends a Friday. Anything that cannot change a decision is a column in a report nobody opens.

Key takeaways

  • A measure belongs on the page only if it changes what somebody does this week.
  • Every measure needs a healthy range for your shop, not a benchmark borrowed from a different kind of manufacturer.
  • The four that predict the quarter come before the six that help explain them.

The measures that actually predict the quarter

About a dozen measures are worth keeping in a manufacturer’s sales function: pipeline coverage, stage accuracy, win rate by segment, quote turnaround, quote-to-close cycle time, discounting rate, lead response time, quota attainment, forecast accuracy and customer concentration. Ten sounds like a lot, and it is, until four of them turn out to predict next quarter better than the other six put together.

1. Pipeline coverage, and whether the stages are true

Coverage is open pipeline divided by the quarter’s target. For a manufacturer running custom or engineered work, 3:1 unweighted is the floor and 4:1 is comfortable, because win rates on orders above $50,000 typically sit between 25% and 35%. Under 2:1 the quarter was decided six weeks ago and nobody has said so out loud.

Coverage only means something if the stages mean something. Pull ten deals a rep has marked closed-lost and ask the buyer, or your estimator, what actually happened. If more than two of them turn out to have been lost on price, your loss reasons are decorative, and the win rate, the forecast and the coaching are all built on a number nobody can trust.

2. Win rate by segment, never win rate overall

One company-wide win rate hides the only comparison that matters. A metal fabricator might convert 70% of repeat call-off orders for existing part numbers and 14% of new-logo work that needs new tooling, and the blend of those two numbers tells the owner nothing at all.

So break it out: repeat call-off, new logo, contract, spot. Then compare each segment against its own last four quarters. If new-logo win rate sits at half of repeat win rate for four quarters running, the problem is not motivation. It is that the team is prospecting and quoting for work it has never delivered, and no amount of pipeline will fix qualification at the front end.

A $40,000 order passes through estimating, quoting, purchasing and scheduling. If each stage files it under a different name, none of the measures above can be trusted.

3. Quote-to-close cycle time, and turnaround at the front

Average days from quote sent to purchase order received is the measure sales and operations finally agree on, because both of them feel it. Track standard parts and engineered work separately. A healthy shop runs 20 to 35 days on standard work and 45 to 75 on custom with tooling; above 80 on custom, you are holding capacity the floor has already promised to somebody else.

Watch the two ends separately. First response to an inbound request should be inside one business day, and cycle time has to be measured on every quote you sent rather than the ones you won. Measuring only the wins turns cycle time into a vanity number that always improves in the same quarter the pipeline gets weak.

4. Discounting rate, and what it is doing to the margin

This is where a manufacturer’s margin disappears without anyone ever deciding to lose it. Track the average discount off list weighted by dollars, and the share of orders that went out with any discount at all. A healthy shop runs under 8% average discount with no more than a third of orders discounted. Above 15%, you are competing on price you have not earned.

Forecast accuracy closes the loop. Compare committed forecast against actual bookings every quarter and aim to be within 10% by the second quarter of measuring. A team running 20% light has a pipeline problem. A team running 20% heavy has a stage-definition problem, and the tell is deals sitting at 90% likely for two months before anyone has seen a drawing.

“Ask for the number, ask for the range it should be in, then ask what you are going to do about it. Miss any one of the three and you are having a conversation, not running a sales function.”

What to do this quarter

Start with four numbers, not forty. Take the four measures above, write down what a healthy range looks like for your shop using your own last four quarters, and put them on one page that fits inside a weekly meeting. Fix the data before you fix the number: stage names, one exit criterion per stage in a single sentence, and one named owner on every open opportunity.

Then give each measure a name and a review. Coverage, cycle time, win rate by segment and discounting rate get looked at every week; forecast accuracy and customer concentration every month; all of them against the same ranges every quarter. If you want that cadence set up properly and do not have a VP of Sales in the building, that is the part a fractional engagement does best.

  • Sales KPIs
  • Sales Process
  • Manufacturing

Greg Coyne

Founder and Fractional VP of Sales, Lion’s Keep Consulting


Frequently Asked Questions

How many KPIs should a manufacturer’s sales team actually track?

Ten is a realistic ceiling for a shop between $5M and $100M: pipeline coverage, stage accuracy, win rate by segment, quote turnaround, quote-to-close cycle time, discounting rate, lead response time, quota attainment, forecast accuracy and customer concentration. Starting with all ten guarantees you track none of them. Start with the four that predict the quarter, add the rest once the CRM holds them reliably, and drop any measure that cannot be produced from the CRM without somebody rebuilding a spreadsheet by hand.

Our win rate is 30%. Is that good?

It depends entirely on what you are counting. Repeat call-off work on standard part numbers in a healthy manufacturer can run 60% to 80%, while first-time custom work with new tooling often converts at 10% to 20%. A blended 30% tells a leadership team very little, which is exactly why win rate by segment is the version worth reporting. Hold each segment against its own last four quarters, and watch the one you are investing in rather than the one that is easiest to hit.

What do we do when the numbers in our CRM cannot be trusted?

Measure them anyway for one quarter, and write down where the data actually comes from. Most manufacturer’s pipelines are not wrong so much as unowned: opportunities with no next step, no date and no close probability, updated whenever the rep happens to remember. Set one rule first, that every open opportunity carries a named next step and a date, then run the four measures on the result. The baseline does not have to be good. It only has to be consistent.

Read More

Case study

Aerospace Manufacturing: Turning a 10% Decrease in Sales into a 14% Increase

Read the case study

Case study

Aerospace Manufacturing: Turning a 10% Decrease in Sales into a 14% Increase

Read the case study

Case study

Aerospace Manufacturing: Turning a 10% Decrease in Sales into a 14% Increase

Read the case study

Do You Know What Your Sales Numbers Are Saying?

Book a free consultation. Bring twelve months of pipeline and we will tell you which of the four measures is actually broken.